20th Feb 2012

Flushing the temporary water line

Today we flushed the super chlorinated water out of the temporary water line.  We created a container that removed the chlorine at the bottom of the flush line.  Sample is at the lab and will be tested to make sure it is bacteria free and ready for human consumption.

Bruce samples the Chlorine level while flushing the temporary water line

Bruce samples the Chlorine level while flushing the temporary water line

Posted by operator under Well Phase II Updates | Comments Off on Flushing the temporary water line

19th Feb 2012

Temporary Piping Connected to Fire Hydrant

Debby & Jean working on final segment of temporary piping

Debby & Jean working on final segment of temporary piping

Today Debby, Rich, Jean & Bruce finished connection to the Fire Hydrant on Tochinni Street.  Pipe is super chlorinating for a 24 hour period.  Tomorrow we will flush & take sample to the lab.

Jean Helping Deb & Rich

Jean Helping Deb & Rich

Rich Helps being the muscleman

Rich Helps being the muscleman

 

Posted by operator under Well Phase II Updates | Comments Off on Temporary Piping Connected to Fire Hydrant

18th Feb 2012

Block Captains Contacting Neighbors

Today and tomorrow, block captains are contacting their neighbors to inform them about the mandatory Water Conservation Notice needed for Wednesday, Thursday, and Friday, next week.  Get to know them, they are neighbors that are volunteers that help us during emergency times.   A BIG Thank You to all of you.

Posted by operator under Well Phase II Updates | Comments Off on Block Captains Contacting Neighbors

17th Feb 2012

Starting to lay Temporary piping

Friday, February 17th, temporary piping will start to go in.  There will be road barricades on the side walk and on the street in front of the fire hydrant on Tochinni Street starting Sunday, February 19th  They will stay there until the project is over.

Use your water this weekend.  Next week during the week we want to Conserve as much as possible.

Thank you,  Debby, Bruce, and the Belmont Terrace Mutual Water Company Board

 Bruce filling a sand bag

 

Debby carrying temporary water line section


Posted by operator under Well Phase II Updates | Comments Off on Starting to lay Temporary piping

08th Feb 2012

Well UPDATES

The final phase of upgrade project is slated to start work on Wednesday, February 22, 2012.

We will NEED help from everyone in the Terrace to conserve water.

Please no outside watering; no laundry and as low of water usage as possible.  IT is possible that low pressure will be experianced during this piping exchange.  I will post here about the Progress in the evenings.
 

Posted by operator under Well Phase II Updates | Comments Off on Well UPDATES