07th May 2012
Well#1 Gets a new Pump
Today Yager installed a new pump into Well#1. This will be used for emergency by-pass of the tank and if for some reason that Well#2 is unable to work for us.
|
|
Martin prepares finalizes the electrical for well#1 | Wiping down pipe prior to hooking it on the pipe to lower into the well. |
Lifting, Aligning and finally | Tightening the sections of pipe. |
Finalizing the electrical at the surface just prior to lowering the pump in place. | Final step Lower the pump in place. |