07th May 2012
Well#1 Gets a new Pump
Today Yager installed a new pump into Well#1. This will be used for emergency by-pass of the tank and if for some reason that Well#2 is unable to work for us.
![Making final electrical connection at pump Making final electrical connection at pump](http://belmontterrace.org/wp-content/uploads/2012/05/IMG_0482-225x300.jpg)
Martin prepares finalizes the electrical for well#1
Wiping down pipe prior to hooking it on the pipe to lower into the well.
![aligning the pipe aligning the pipe](http://belmontterrace.org/wp-content/uploads/2012/05/IMG_0486-225x300.jpg)
![Tightening it up Tightening it up](http://belmontterrace.org/wp-content/uploads/2012/05/IMG_0493-225x300.jpg)
Lifting, Aligning and finally
Tightening the sections of pipe.
![Finalizing electrical at the wellhead. Finalizing electrical at the wellhead.](http://belmontterrace.org/wp-content/uploads/2012/05/IMG_0499-225x300.jpg)
Finalizing the electrical at the surface just prior to lowering the pump in place.
Final step Lower the pump in place.
Today Yager installed a new pump into Well#1. This will be used for emergency by-pass of the tank and if for some reason that Well#2 is unable to work for us.
![]() |
|
Martin prepares finalizes the electrical for well#1 | Wiping down pipe prior to hooking it on the pipe to lower into the well. |
![]() |
![]() |
Lifting, Aligning and finally | Tightening the sections of pipe. |
![]() |
|
Finalizing the electrical at the surface just prior to lowering the pump in place. | Final step Lower the pump in place. |