07th May 2012
Well#1 Gets a new Pump
Today Yager installed a new pump into Well#1. This will be used for emergency by-pass of the tank and if for some reason that Well#2 is unable to work for us.
Martin prepares finalizes the electrical for well#1
Wiping down pipe prior to hooking it on the pipe to lower into the well.
Lifting, Aligning and finally
Tightening the sections of pipe.
Finalizing the electrical at the surface just prior to lowering the pump in place.
Final step Lower the pump in place.
Today Yager installed a new pump into Well#1. This will be used for emergency by-pass of the tank and if for some reason that Well#2 is unable to work for us.
|
|
Martin prepares finalizes the electrical for well#1 | Wiping down pipe prior to hooking it on the pipe to lower into the well. |
Lifting, Aligning and finally | Tightening the sections of pipe. |
Finalizing the electrical at the surface just prior to lowering the pump in place. | Final step Lower the pump in place. |
Posted in Well Phase II Updates | Comments Off on Well#1 Gets a new Pump