Archive for May, 2012

07th May 2012

Well#1 Gets a new Pump

Today Yager installed a new pump into Well#1.  This will be used for emergency by-pass of the tank and if for some reason that Well#2 is unable to work for us.

 Making final electrical connection at pump

Getting ready to connect to Well#1

 Martin prepares finalizes the electrical for well#1  Wiping down pipe prior to hooking it on the pipe to lower into the well.


 aligning the pipe  Tightening it up
 Lifting, Aligning and finally  Tightening the sections of pipe.

 

 Finalizing electrical at the wellhead.  

Lowering Wellhead down in place

 Finalizing the electrical at the surface just prior to lowering the pump in place.  Final step Lower the pump in place.

 

Posted in Well Phase II Updates | Comments Off on Well#1 Gets a new Pump

grupa LGBT